Inventory examples
- Storage tanks
- Reactors
- Heat exchangers
- Columns and towers
- Autoclaves
What we review
A manufacturing facility is upgrading its processing line and needs to clear out several decommissioned ASME-stamped pressure vessels to make room for new equipment.

Seller scenario
A manufacturing facility is upgrading its processing line and needs to clear out several decommissioned ASME-stamped pressure vessels to make room for new equipment.
Inventory scope
Review factors
Evaluate the interior and exterior for signs of pitting, corrosion, or structural fatigue. The integrity of the shell, heads, and nozzles is critical for potential reuse.
Original U-1 or U-1A manufacturer data reports and maintenance logs detailing any repairs or alterations are highly valuable.
Evaluation typically considers the vessel's age, material of construction, design pressure and temperature ratings, and the availability of original documentation.
Freight and site facts
Transportation requirements depend on the vessel's dimensions and weight, as well as site accessibility and available lifting equipment.
Practical answers
Show the complete equipment and close views of national board number, asme u-stamp data plate, manufacturer serial number, year built.
Evaluate the interior and exterior for signs of pitting, corrosion, or structural fatigue. The integrity of the shell, heads, and nozzles is critical for potential reuse.
Original U-1 or U-1A manufacturer data reports and maintenance logs detailing any repairs or alterations are highly valuable.
Start with the nameplate
Clear photographs and a basic inventory list are useful. Do not repair, energize, pressurize, or move equipment solely for this form.